RCC House Project Timeline Generator

Concurrent Model

Advanced concurrent activities model for construction planning

Powered by

Plinth Area

Number of Storeys

Construction Style

Project Start Date

Total Duration

177

Days (~6 months)

Completion Date

11/18/2025

Project Scale

1000

sq ft • 1 Storey

Construction Style

Standard/Basic

Low Complexity

Project Gantt Chart
41 Activities

Concurrent Activities Overview

Day 1: 2 parallel activities
Day 113: 4 parallel activities
Day 128: 4 parallel activities
Day 139: 2 parallel activities
Day 153: 3 parallel activities
Day 160: 2 parallel activities
+2 more concurrent periods
Activity Name
Site Survey & Soil Testing
Pre-Construction
Architectural Design & Approval
Pre-Construction
Structural Design
Pre-Construction
Building Permits & NOC
Pre-Construction
Material Procurement Planning
Pre-Construction
Site Preparation & Excavation
Foundation Work
Foundation Layout & Marking
Foundation Work
Foundation Concrete Work
Foundation Work
Foundation Curing
Foundation Work
Plinth Beam & DPC
Foundation Work
Ground Floor Columns & Beams
Superstructure (Sequential per Floor)
Ground Floor Slab
Superstructure (Sequential per Floor)
Upper Floors (Per Floor)
Superstructure (Sequential per Floor)
Roof Slab Construction
Superstructure (Sequential per Floor)
Structural Curing (Final)
Superstructure (Sequential per Floor)
External Wall Masonry
Masonry & External Work
Internal Wall Masonry
Masonry & External Work
Parapet & Boundary Walls
Masonry & External Work
Roof Waterproofing
Masonry & External Work
Electrical Conduit & Wiring
MEP Rough-in Work
Plumbing Lines & Drainage
MEP Rough-in Work
HVAC Ducting (if applicable)
MEP Rough-in Work
Fire Safety Systems
MEP Rough-in Work
Internal Plastering
Plastering & Surface Prep
External Plastering
Plastering & Surface Prep
Ceiling Work
Plastering & Surface Prep
Floor Preparation & Screed
Flooring & Interior Work
Flooring Installation
Flooring & Interior Work
Door & Window Frames
Flooring & Interior Work
Door & Window Installation
Flooring & Interior Work
Interior Painting
Finishing & MEP Final
Exterior Painting
Finishing & MEP Final
Kitchen & Bathroom Tiling
Finishing & MEP Final
Electrical Fixtures & Points
Finishing & MEP Final
Plumbing Fixtures
Finishing & MEP Final
Kitchen Cabinets & Fittings
Finishing & MEP Final
Final MEP Testing & Commissioning
Final Works & Handover
Touch-up & Defect Rectification
Final Works & Handover
External Works & Landscaping
Final Works & Handover
Final Cleaning
Final Works & Handover
Final Inspection & Handover
Final Works & Handover
Day
0
Day
10
Day
20
Day
30
Day
40
Day
50
Day
60
Day
70
Day
80
Day
90
Day
100
Day
110
Day
120
Day
130
Day
140
Day
150
Day
160
Day
170
4d
17d
11d
20d
4d
5d
2d
7d
7d
5d
8d
6d
12d
7d
16d
20d
15d
6d
5d
11d
9d
6d
5d
14d
12d
9d
7d
12d
7d
5d
9d
7d
9d
7d
7d
7d
4d
6d
7d
4d
2d
Start

Construction Phases

Pre-Construction
5
Foundation Work
5
Superstructure (Sequential per Floor)
5
Masonry & External Work
4
MEP Rough-in Work
4
Plastering & Surface Prep
3
Flooring & Interior Work
4
Finishing & MEP Final
6
Final Works & Handover
5

Chart Elements

Concurrent Activities
Sequential Activities
Has Dependencies

Concurrent Activities Benefits
20-30% Faster

Masonry can start after ground floor slab completion
MEP rough-in overlaps with masonry work
Plastering begins immediately after MEP installation
Interior finishing activities run in parallel
Reduces overall project duration significantly

Critical Considerations
Important

Weather conditions may extend exterior work phases
Material delivery coordination is crucial for concurrent activities
Skilled labor availability affects parallel work execution
Quality control checkpoints between dependent phases
Site safety protocols for multiple simultaneous activities