Advanced concurrent activities model for construction planning
Powered by
Important Disclaimer: This timeline is a prediction based on standard construction practices and ideal conditions. Actual project duration may vary due to weather conditions, material availability, labor resources, site conditions, permit processing times, design changes, and other unforeseen circumstances. Please consult with construction professionals for accurate project planning and scheduling.
Plinth Area
Number of Storeys
Construction Style
Project Start Date
Total Duration
177
Days (~6 months)
Completion Date
11/18/2025
Project Scale
1000
sq ft • 1 Storey
Construction Style
Standard/Basic
Low Complexity
Project Gantt Chart
41 Activities
Concurrent Activities Overview
Day 1: 2 parallel activities
Day 113: 4 parallel activities
Day 128: 4 parallel activities
Day 139: 2 parallel activities
Day 153: 3 parallel activities
Day 160: 2 parallel activities
+2 more concurrent periods
Activity Name
Site Survey & Soil Testing
Pre-Construction
Concurrent
Architectural Design & Approval
Pre-Construction
Concurrent
Structural Design
Pre-Construction
Concurrent
Building Permits & NOC
Pre-Construction
Concurrent
Material Procurement Planning
Pre-Construction
Concurrent
Site Preparation & Excavation
Foundation Work
Foundation Layout & Marking
Foundation Work
Foundation Concrete Work
Foundation Work
Foundation Curing
Foundation Work
Plinth Beam & DPC
Foundation Work
Ground Floor Columns & Beams
Superstructure (Sequential per Floor)
Ground Floor Slab
Superstructure (Sequential per Floor)
Upper Floors (Per Floor)
Superstructure (Sequential per Floor)
Roof Slab Construction
Superstructure (Sequential per Floor)
Structural Curing (Final)
Superstructure (Sequential per Floor)
External Wall Masonry
Masonry & External Work
Concurrent
Internal Wall Masonry
Masonry & External Work
Concurrent
Parapet & Boundary Walls
Masonry & External Work
Concurrent
Roof Waterproofing
Masonry & External Work
Concurrent
Electrical Conduit & Wiring
MEP Rough-in Work
Concurrent
Plumbing Lines & Drainage
MEP Rough-in Work
Concurrent
HVAC Ducting (if applicable)
MEP Rough-in Work
Concurrent
Fire Safety Systems
MEP Rough-in Work
Concurrent
Internal Plastering
Plastering & Surface Prep
Concurrent
External Plastering
Plastering & Surface Prep
Concurrent
Ceiling Work
Plastering & Surface Prep
Concurrent
Floor Preparation & Screed
Flooring & Interior Work
Concurrent
Flooring Installation
Flooring & Interior Work
Concurrent
Door & Window Frames
Flooring & Interior Work
Concurrent
Door & Window Installation
Flooring & Interior Work
Concurrent
Interior Painting
Finishing & MEP Final
Concurrent
Exterior Painting
Finishing & MEP Final
Concurrent
Kitchen & Bathroom Tiling
Finishing & MEP Final
Concurrent
Electrical Fixtures & Points
Finishing & MEP Final
Concurrent
Plumbing Fixtures
Finishing & MEP Final
Concurrent
Kitchen Cabinets & Fittings
Finishing & MEP Final
Concurrent
Final MEP Testing & Commissioning
Final Works & Handover
Concurrent
Touch-up & Defect Rectification
Final Works & Handover
Concurrent
External Works & Landscaping
Final Works & Handover
Concurrent
Final Cleaning
Final Works & Handover
Concurrent
Final Inspection & Handover
Final Works & Handover
Concurrent
Day
0
Day
10
Day
20
Day
30
Day
40
Day
50
Day
60
Day
70
Day
80
Day
90
Day
100
Day
110
Day
120
Day
130
Day
140
Day
150
Day
160
Day
170
4d
17d
11d
20d
4d
5d
2d
7d
7d
5d
8d
6d
12d
7d
16d
20d
15d
6d
5d
11d
9d
6d
5d
14d
12d
9d
7d
12d
7d
5d
9d
7d
9d
7d
7d
7d
4d
6d
7d
4d
2d
Start
Construction Phases
Pre-Construction
5
Foundation Work
5
Superstructure (Sequential per Floor)
5
Masonry & External Work
4
MEP Rough-in Work
4
Plastering & Surface Prep
3
Flooring & Interior Work
4
Finishing & MEP Final
6
Final Works & Handover
5
Chart Elements
Concurrent Activities
Sequential Activities
Has Dependencies
Construction Methodology: This timeline uses an advanced concurrent activities model that optimizes project duration by allowing overlapping phases where dependencies permit.
Concurrent Activities Benefits
20-30% Faster
Masonry can start after ground floor slab completion
MEP rough-in overlaps with masonry work
Plastering begins immediately after MEP installation
Interior finishing activities run in parallel
Reduces overall project duration significantly
Critical Considerations
Important
Weather conditions may extend exterior work phases
Material delivery coordination is crucial for concurrent activities
Skilled labor availability affects parallel work execution
Quality control checkpoints between dependent phases